Our Work

Townhouse framing, community parks, covered walkways and commercial fit-outs. A look at what we’ve built across Victoria.

18 projects
Watt Street, Spotswood Framing
Spotswood, VIC

Watt Street

Double-storey townhouse development in Spotswood for Beehiva Homes, completed through structural framing, box gutters, parapets, and window installation.

Case study
Blackshaws Road, Altona North Framing
Altona North, VIC

Blackshaws Road

Complete structural framing works for three double-storey townhouses in Altona North, delivered in partnership with Beehiva Homes.

Case study
Fifth Ave, Altona North Framing
Altona North, VIC

Fifth Ave

Two side-by-side single storey frames and roofs completed in Altona North, including wall frames, trusses, and roof structures, ready for the next stage.

Case study
Mels Place, Lysterfield Framing
Lysterfield, VIC

Mels Place

Structural framing package for a double-storey home in Lysterfield for BDA Homes, including the complete frame construction from slab set-out through to roof structure.

Case study
Neimur Ave, Deer Park Framing
Deer Park, VIC

Neimur Ave

Structural framing works completed for 3x double story dwelling, with detailed attention to alignment, floor levels, and framing layout to ensure consistency across the build.

Case study
O'Keefe St, Preston Renovation
Preston, VIC

O'Keefe St

Renovation and extension to an existing single storey dwelling in Preston, including new structural framing and roof construction, with structural loads transferred and integrated into the existing structure.

Case study
Woodman Circuit, Wollert Residential
Wollert, VIC

Woodman Circuit

We delivered the full construction of this double-storey home in Wollert, taking the project from the initial frame through to lock-up, external cladding, and final carpentry fix.

Case study
Lauderdale Dr, Craigieburn Decking
Craigieburn, VIC

Lauderdale Dr

Removal of an existing deteriorated balcony deck, including disposal of all damaged materials, followed by reconstruction of the structural framing and installation of new decking boards, delivering a safe, stable, and long-lasting outdoor space.

Case study
Lewis St, Flemington Carpentry
Flemington, VIC

Lewis St

Internal fix completed in Flemington, including installation and hanging of internal doors, skirting, and architraves, delivered with a clean finish and ready for final painting and handover.

Case study
Alimak Access Ramp/Covered Walkway Commercial
Melbourne CBD, VIC

Alimak Access Ramp/Covered Walkway

Construction of a purpose-built Alimak access ramp, complete with overhead protection and fully enclosed sides, ensuring safe, efficient, and weather-protected access to the Alimak system on site

Case study
Temporary Site Amenities Commercial
Melbourne CBD, VIC

Temporary Site Amenities

Temporary site toilet facilities constructed within the Melbourne CBD, designed for durability, compliance, and ease of use. Works included full installation and setup to meet site requirements, ensuring practical and reliable amenities for ongoing construction operations.

Case study
Undercover Site Walkways Commercial
Melbourne, VIC

Undercover Site Walkways

Undercover walkway completed for a Hickory site, including structural framing, sheeted roofing, and enclosed walls to provide protected access across the work area.

Case study
Hume Anglican Grammar Education
Mickleham, VIC

Hume Anglican Grammar

Construction of an undercover walkway at Hume Grammar, providing continuous weather protection across key student pathways. Works included post install, structural framing and integration with existing access routes to ensure safe and practical movement throughout the campus.

Case study
Custom Playground Pod Community
Melbourne, VIC

Custom Playground Pod

Custom playground installation for Blanc Space, featuring uniquely shaped forms and detailed external cladding, delivering a one-off structure that stands out through its design and finish.

Case study
Frankston Arts Centre Community
Frankston, VIC

Frankston Arts Centre

Timber cladding and seating installation at Frankston Arts Centre, including fit-off of hardwood seat slats with clean detailing and secure fixings, integrated into the hardwood deck.

Case study
Peppercorn Hill Park Development Community
Northern Suburbs, VIC

Peppercorn Hill Park Development

Supply, install, and finishing of custom park seating for new subdivision projects across Melbourne's northern suburbs, including premium timber finishes.

Case study
Riverside Pirate Ship Community
Moonee Valley, VIC

Riverside Pirate Ship

Refurbishment of a community playground pirate ship, featuring upgraded safety elements, brand-new decking, and high-quality refreshed finishes, bringing the structure back to life as a safe, durable, and engaging space for years of enjoyment.

Case study
Springridge Estate, Wallan Community
Wallan, VIC

Springridge Estate

Bridge installation at Springridge Estate, including construction of footings, placement and installation of the steel bridge carcass, and final cladding with decking boards. Delivered as a complete package to provide a durable and functional connection within the estate.

Case study
Have a project in mind?

Let’s build
something that lasts.

Tell us what you’re building and we’ll take it from there.

Get in touch