Lewis St
Internal fix completed in Flemington, including installation and hanging of internal doors, skirting, and architraves, delivered with a clean finish and ready for final painting and handover.
The brief
Kallibre engaged us to complete the fit-off stage of a residential home in Flemington. This final stage of carpentry included installing internal doors, skirtings, and architraves, transforming the plastered shell into a finished home. As finish carpentry demands a high level of precision, every detail was completed with clean lines, tight joins, and close coordination with the other trades on site.
How we built it
We worked room by room, installing internal doors and fitting skirtings and architraves with careful attention to straight lines, levels, and clean joins. Each detail was completed to complement the existing character of the home, maintaining its heritage features while delivering a high-quality, refined finish.
The outcome
Handed back to Kallibre clean and ready for the painters. Neat lines, doors swinging true, nothing left to come back and chase.
Related projects
Framing Watt Street
Double-storey townhouse development in Spotswood for Beehiva Homes, completed through structural framing, box gutters, parapets, and window installation.
Case study
Framing Blackshaws Road
Complete structural framing works for three double-storey townhouses in Altona North, delivered in partnership with Beehiva Homes.
Case study
Framing Fifth Ave
Two side-by-side single storey frames and roofs completed in Altona North, including wall frames, trusses, and roof structures, ready for the next stage.
Case study