Structural Framing

Fifth Ave

Location Altona North, VICClient Beehiva HomesYear 2025Status Completed

Two side-by-side single storey frames and roofs completed in Altona North, including wall frames, trusses, and roof structures, ready for the next stage.

The brief

Beehiva Homes engaged us to complete the carpentry works for a dual occupancy development on Fifth Avenue, Altona North. The project involved two single-storey homes built side by side on one site, requiring accurate set-out from both slabs and careful coordination to ensure both dwellings aligned correctly from the first stage of construction.

How we built it

We started by setting out the slabs and installing the wall frames, working through the standard framing process from the ground up. Once the walls were stood and secured, the floors and roof structure were installed, followed by bracing and adjustments to ensure everything was aligned correctly. Windows and external openings were then prepared, completing the frame and creating a solid structure ready for the next stage of construction

Fifth Ave, Altona North
Dual occupancy frame completed at Fifth Avenue, Altona North, with both dwellings framed and roof trusses installed as part of the full carpentry package.

The outcome

Both homes were framed and brought to lock-up stage, with the structure completed and ready for the next stage of construction. The site was handed back to Beehiva’s trades clean and organised, with the carpentry works completed to a high standard.

On site