Blackshaws Road
Complete structural framing works for three double-storey townhouses in Altona North, delivered in partnership with Beehiva Homes.
The brief
Beehiva Homes engaged us to complete the structural framing of three double-storey townhouses at Blackshaws Road, Altona North. With three dwellings being built on the one site, accurate set-out and attention to detail were critical from the first stage to ensure each structure aligned correctly throughout the build.
How we built it
We began by setting out the slabs before constructing the ground-floor frames. Once the ground floor was complete, the Posi-Strut flooring was installed, followed by the first-floor framing and roof trusses. The parapets and box gutters were then framed as part of the roof structure before the windows were installed. Each stage was checked throughout the build to ensure the three townhouses progressed correctly through to the next phase of construction.
The outcome
Three double-storey townhouse frames completed, with the structures brought through the framing stage and handed over to Beehiva’s trades ready for the next phase of construction. The works were completed with all required inspections addressed and the site left ready for following trades.
Related projects
Framing Watt Street
Double-storey townhouse development in Spotswood for Beehiva Homes, completed through structural framing, box gutters, parapets, and window installation.
Case study
Framing Fifth Ave
Two side-by-side single storey frames and roofs completed in Altona North, including wall frames, trusses, and roof structures, ready for the next stage.
Case study
Framing Mels Place
Structural framing package for a double-storey home in Lysterfield for BDA Homes, including the complete frame construction from slab set-out through to roof structure.