Blackshaws Road, Altona North
Complete structural framing and window installation for 3 X double-story townhouses in Altona North, undertaken in partnership with Beehiva Homes.




Complete structural framing and window installation for 3 X double-story townhouses in Altona North, undertaken in partnership with Beehiva Homes.




Supply, install, and finishing of custom park seating for new subdivision projects across Melbourne's northern suburbs, including premium timber finishes.




Construction of a purpose-built Alimak access ramp, complete with overhead protection and fully enclosed sides, ensuring safe, efficient, and weather-protected access to the Alimak system on site




Refurbishment of a community playground pirate ship, featuring upgraded safety elements, brand-new decking, and high-quality refreshed finishes, bringing the structure back to life as a safe, durable, and engaging space for years of enjoyment.




Structural framing works completed for 3x double story dwelling, with detailed attention to alignment, floor levels, and framing layout to ensure consistency across the build.





Construction of an undercover walkway at Hume Grammar, providing continuous weather protection across key student pathways. Works included structural framing, roofing, and integration with existing access routes to ensure safe and practical movement throughout the campus.






Temporary site toilet facilities constructed within the Melbourne CBD, designed for durability, compliance, and ease of use. Works included full installation and setup to meet site requirements, ensuring practical and reliable amenities for ongoing construction operations.





Removal of an existing deteriorated balcony deck, including disposal of all damaged materials, followed by reconstruction of the structural framing and installation of new decking boards, delivering a safe, stable, and long-lasting outdoor space.





Bridge installation at Springridge Estate, including construction of footings, placement and installation of the steel bridge carcass, and final cladding with decking boards. Delivered as a complete package to provide a durable and functional connection within the estate.




Demolition of an existing site office within a warehouse in Dandenong, including safe removal, strip-out, and disposal of materials to clear the area for future use.





Internal fix completed in Flemington, including installation and hanging of internal doors, skirting, and architraves, delivered with a clean finish and ready for final painting and handover.





Custom playground installation for Blanc Space, featuring uniquely shaped forms and detailed external cladding, delivering a one-off structure that stands out through its design and finish.




Full weatherboard cladding installation completed in Wollert, including set-out, fixing, and detailing across the entire double storey build.
Renovation and extension to an existing single storey dwelling in Preston, including new structural framing and roof construction, with structural loads transferred and integrated into the existing structure.




Two side-by-side single storey frames and roofs completed in Altona North, including wall frames, trusses, and roof structures, ready for the next stage.




Undercover walkway completed for a Hickory site, including structural framing, sheeted roofing, and enclosed walls to provide protected access across the work area.




Full house framing completed in Wollert, including ground and upper-level structure, ready for roofing and cladding.




Two storey development in Deer Park, with one dwelling completed and two additional builds underway.